Hitachi X200-002SFE/NFU Instruction Manuals page 49

X200 series. single-phase input 200v class. three-phase input 200v class. three-phase input 400v class.
Table of Contents

Advertisement

2−10
Ensure Adequate Ventilation
Step 2: To summarize the caution messages – you will need to find a solid, non-
2
flammable, vertical surface that is in a relatively clean and dry environment. In order to
ensure enough room for air circulation around the inverter to aid in cooling, maintain
the specified clearance and the inverter specified in the diagram.
CAUTION: Be sure to maintain the specified clearance area around the inverter and to
provide adequate ventilation. Otherwise, the inverter may overheat and cause
equipment damage or fire.
Keep Debris Out of Inverter Vents
Step 3: Before proceeding to the wiring section, it's
3
a good time to
ventilation openings. Paper and masking tape are
all that is needed. This will prevent harmful debris
such as wire clippings and metal shavings from
entering the inverter during installation.
Please observe this checklist while mounting the
inverter:
1. The ambient temperature must be in the range
2. Keep any other heat-producing equipment as
3. When installing the inverter in an enclosure, maintain the clearance around the
4. Do not remove the front housing at any time during operation.
More user manuals on
10 cm (3.94")
Clear area
X200
inverter
5 cm (1.97")
minimum
10 cm (3.94")
temporarily
of −10 to 40°C.
far away from the inverter as possible.
inverter and verify that its ambient is within specification when the enclosure door
is closed.
ManualsBase.com
minimum
5 cm (1.97")
minimum
minimum
covers the inverter's
Air flow
Ventilation holes
(top)
Ventilation holes
(both sides)

Advertisement

Table of Contents
loading

Table of Contents