Test - GE F650 Instruction Manual

Digital bay controller
Hide thumbs Also See for F650:
Table of Contents

Advertisement

11.1 EXAMPLE 1: COMMUNICATION & PROTECTION SETTINGS PROCEDURE
Under
SETPOINT  RELAY CONFIGURATION  LEDS
11
Under
SETPOINT  RELAY CONFIGURATION  OPERATIONS
Select
Command Text
Interlock Type
Interlocks
Final State Type
Final States
Frontal Key
Contact Input
Virtual Output
Time Out
MMI
Com1
Com 2
ETH-Master 1
ETH Master 2
ETH Master 3
ETH Master 4
Under
SETPOINT  RELAY CONFIGURATION  OSCILLOGRAPHY
Apply 7.5 A in phase A (terminals B1-B2) until contact 00 on Board F operates (terminals F19-F21 should be and remain
closed), and LED 5 should be lit. Check that operating time is in the order of 1.7 seconds.
Remove current from terminals B1-B2
Press pushbutton F1 and check that contact 00 on Board F has been open.
Check that LED 5 in the front of the relay has been turned off.
Repeat the process for phase B (terminals B3-B4) and for phase C (terminals B5-B6)
Under Actual  Waveform Capture menu retrieve the last oscillography recording stored, open it using GE_OSC program
and check that the two digital signals as well as the current signal were kept.
11-4
SELECT
NAME
Led 5
C Output Op 00
Operation 0
Reset C Output 00
None
---
None
---
F1
None
None
500 (default)
---
---
---
---
---
---
---
SELECT
NAME
Digital Channel 1
C Output Op_00_00
Digital Channel 2
C Output_00_00
F650 Digital Bay Controller
11 APPLICATION EXAMPLES
SOURCE
C Output_00_00
SOURCE
C Output Oper_00_00
C Output_00_00

11.1.4 TEST

GEK-106310AB

Advertisement

Table of Contents
loading

Table of Contents