GE F650 Instruction Manual page 353

Digital bay controller
Hide thumbs Also See for F650:
Table of Contents

Advertisement

6.3 METERING
6.3.1.4 ENERGY
Actual> Metering > Primary Values > Energy
Energy is only given in three phase primary values
Table 6–40: ENERGY PRIMARY VALUES
When the energy counters reach the value (2ˆ 31)/1000 (approximately 2147483 MVArh and MWh) all the values are set to
zero and starts counting again.
6.3.1.5 DEMAND
Actual> Metering > Primary Values > Demand
Demand is only given in primary values
Table 6–41: DEMAND PRIMARY VALUES
6
6-30
DESCRIPTION
Positive MWatthour
Negative MWatthour
Positive MVarhour
Negative MVarhour
Pos Mwatthour Cnt
Neg Mwatthour Cnt
Pos MVarhour Cnt
Neg MVarhour Cnt
DESCRIPTION
UNITS
DEMAND IA
KA
DEMAND IA MAX
KA
DEMAND IA DATE
dd/mm/yy hh:mm:ss:ms
DEMAND IB
KA
DEMAND IB MAX
KA
DEMAND IB DATE
dd/mm/yy hh:mm:ss:ms
DEMAND IC
KA
DEMAND IC MAX
KA
DEMAND IC DATE
dd/mm/yy hh:mm:ss:ms
DEMAND IG
KA
DEMAND IG MAX
KA
DEMAND IG DATE
dd/mm/yy hh:mm:ss:ms
DEMAND ISG
KA
DEMAND ISG MAX
KA
DEMAND ISG DATE
dd/mm/yy hh:mm:ss:ms
DEMAND I2
KA
DEMAND I2 MAX
KA
DEMAND I2 DATE
dd/mm/yy hh:mm:ss:ms
DEMAND W
MW
DEMAND W MAX
MW
DEMAND W DATE
dd/mm/yy hh:mm:ss:ms
DEMAND VAR PWR
MVAr
DEMAND VAR MAX
MVAr
DEMAND VAR DATE
dd/mm/yy hh:mm:ss:ms
DEMAND VA PWR
MVA
DEMAND VA MAX
MVA
DEMAND VA DATE
dd/mm/yy hh:mm:ss:ms
F650 Digital Bay Controller
UNITS
MWh
MWh
MVArh
MVArh
MWh
MWh
MVArh
MVArh
6 ACTUAL VALUES