Siemens SINAMICS G120D Original Instructions Manual page 67

Cu250d-2 series
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

17. Set the Ramp Up time in seconds.
18. Set the Ramp Down time in seconds.
19. A summary of all the settings is display.
20. The final screen gives two options:
The basic commissioning of your converter is finished.
Converter with control units CU250D-2
Operating Instructions, 04/2014, FW V4.7, A5E34261542B AA
This is the time the Inverter/motor system will take from
being given the run command, to reaching the selected
motor speed.
This is the time the Inverter/motor system will take from
being given the OFF1 command, for the motor to reach
a standstill.
If the settings are correct, select Continue.
• Save settings
• Cancel Wizard
If save is selected, a factory reset will be performed then
the settings are saved to the Inverter memory. The
location of safe data is assigned using the "Parameter
saving mode" function in "Parameter settings" in
"Menu".
Commissioning
5.4 Basic commissioning with IOP
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents