Commissioning Sequence - Siemens SINAMICS G120D Original Instructions Manual

Cu250d-2 series
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Setting functions
8.6 Basic positioner and position control
8.6.2

Commissioning sequence

We recommend that you commission the basic positioner using the "STARTER" tool.
Downloading: STARTER
(http://support.automation.siemens.com/WW/view/en/10804985/133200).
148
Assign encoders to the axes (Page 72)
Set the communication via the fieldbus (Page 85)
Optimize the speed control (Page 136)
Normalize the encoder signal (Page 149)
Set the axis traversing range (Page 156)
Optimizing the position controller (Page 158)
Set the positioning accuracy (Page 164)
Establish the reference to the machine zero point
(Page 169)
Setup the axis (Page 185)
Save and call the traversing blocks in the
converter (Page 188)
or
Enter a position setpoint from the external control
via fieldbus (Page 203)
Operating Instructions, 04/2014, FW V4.7, A5E34261542B AA
Converter with control units CU250D-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents