4.4.10
Connecting the inverter with the PM250 Power Module
Figure 4-28
Connecting the PM250 Power Module
Table 4-30
Connection, cross-section and tightening torque for PM250 Power Modules
Inverters
Line supply and motor connection
FSC
FSD
FSE
FSF
Connections for frame size FSC
Converter with the CU230P-2 Control Units
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE
Screw-type terminal
Cable lug
4.4 Connecting the line supply and motor
Cross-section and tightening torque
Metric
4 ...10 mm
, 2.3 Nm
12 ... 8 AWG, 20 lbf in
2
10 ... 35 mm
, 6 Nm
7 ... 2 AWG, 53 lbf in
2
25 ... 50 mm
, 6 Nm
3 ... 1 AWG, 53 lbf in
2
35 ... 120 mm
, 13 Nm 2 ... 4/0 AWG, 115 lbf in --
2
Installing
Stripped
insulation
Imperial
length
10 mm
--
--
103