Connecting The Profibus Cable To The Inverter; What Do You Have To Set For Communication Via Profibus - Siemens SINAMICS G120 Operating Instructions Manual

Low voltage converters built-in and wall mounting units with cu230p-2 control units
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

The PROFIBUS DP interface has the following functions:
● Cyclic communication
● Acyclic communication
● Diagnostic alarms
General information on PROFIBUS DP can be found in the Internet:
● Information about PROFIBUS DP
support/printkatalog.htm)
● PROFIBUS user organization (http://www.profibus.com/downloads/installation-guide/)
4.5.11.1

Connecting the PROFIBUS cable to the inverter

Procedure
To connect the inverter to a control via PROFIBUS DP, proceed as follows:
1. Integrate the inverter into the bus system (e.g. line topology) of the control using PROFIBUS
cables via socket X126.
The maximum permitted cable length to the previous station and the subsequent one is
100 m at a baud rate of 12 Mbit/s.
2. Externally supply the inverter with 24 VDC through terminals 31 and 32.
The external 24 V supply is only required if communications with the control should also
run when the line voltage is switched off.
You have now connected the inverter to the control using PROFIBUS DP.
Communication with the controller even when the supply voltage on the Power Module is
switched off
You must supply the Control Unit with 24 V DC at terminals 31 and 32 if you wish to maintain
communication with the control system when the line voltage is switched off.
In the case of brief interruptions of the 24 V power supply, the inverter may signal a fault without
communications with the control system being interrupted.
4.5.11.2

What do you have to set for communication via PROFIBUS?

Configuring PROFIBUS communication
Proceed as follows to configure the communication between the PROFIBUS master and the
inverter as PROFIBUS slave:
1. Configure the PROFIBUS master and the PROFIBUS slave with an engineering system,
e.g. with HW-Config.
If required, install the GSD file of the inverter in the engineering system.
2. Load the configuration data into the PROFIBUS master.
Converter with the CU230P-2 Control Units
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE
Overview of the interfaces (Page 109)
Installing the GSD (Page 142)
4.5 Connecting the interfaces for the inverter control
(http://www.automation.siemens.com/net/html_76/
Installing
141

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120p

Table of Contents