Handling The Bop 2 Operator Panel - Siemens SINAMICS G120 Operating Instructions Manual

Low voltage converters built-in and wall mounting units with cu230p-2 control units
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

A.2

Handling the BOP 2 operator panel

Status display once the power supply for the inverter has been switched on.
1)
Figure A-1
Menu of the BOP-2
Figure A-2
Other keys and symbols of the BOP-2
Converter with the CU230P-2 Control Units
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE
A.2 Handling the BOP 2 operator panel
Appendix
525

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120p

Table of Contents