Installation Direction And Clearances - Mitsubishi Electric MR-J4-10B(-RJ) Instruction Manual

General-purpose ac servo melservo-j4 sscnet /h interface mr-j4 series servo amplifier
Table of Contents

Advertisement

2. INSTALLATION

2.1 Installation direction and clearances

CAUTION
(1) Installation clearances of the servo amplifier
(a) Installation of one servo amplifier
Cabinet
10 mm
or more
(Note 2)
Note 1. For 11 kW to 22 kW servo amplifiers, the clearance between the bottom and ground will be 120 mm or more.
2. When mounting MR-J4-500B(-RJ), maintain a minimum clearance of 25 mm on the left side.
The equipment must be installed in the specified direction. Otherwise, it may
cause a malfunction.
Leave specified clearances between the servo amplifier and the cabinet walls or
other equipment. Otherwise, it may cause a malfunction.
40 mm or more
Servo amplifier
10 mm
or more
40 mm
or more
(Note 1)
Cabinet
Wiring allowance
80 mm or more
2 - 2
Top
Bottom

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents