2. INSTALLATION
2.1 Installation direction and clearances
CAUTION
(1) Installation clearances of the servo amplifier
(a) Installation of one servo amplifier
Cabinet
10 mm
or more
(Note 2)
Note 1. For the 11 kW to 22 kW servo amplifiers, the clearance between the bottom and the ground will be 120 mm or more.
2. For the MR-J4-500B-RJ010, the clearance between the left side and wall will be 25 mm or more.
The equipment must be installed in the specified direction. Otherwise, it may
cause a malfunction.
Leave specified clearances between the servo amplifier/MR-J3-T10 and the
cabinet walls or other equipment. Otherwise, it may cause a malfunction.
40 mm or more
Servo amplifier
10 mm
or more
40 mm
or more
(Note 1)
Cabinet
Wiring allowance
80 mm or more
2 - 2
Top
Bottom