Installation Direction And Clearances - Mitsubishi Electric MR-J4-*B-RJ010 Series Instruction Manual

General purpose ac servo amplifier cc-link ie field network interface with motion
Hide thumbs Also See for MR-J4-*B-RJ010 Series:
Table of Contents

Advertisement

2. INSTALLATION

2.1 Installation direction and clearances

CAUTION
(1) Installation clearances of the servo amplifier
(a) Installation of one servo amplifier
Cabinet
10 mm
or more
(Note 2)
Note 1. For the 11 kW to 22 kW servo amplifiers, the clearance between the bottom and the ground will be 120 mm or more.
2. For the MR-J4-500B-RJ010, the clearance between the left side and wall will be 25 mm or more.
The equipment must be installed in the specified direction. Otherwise, it may
cause a malfunction.
Leave specified clearances between the servo amplifier/MR-J3-T10 and the
cabinet walls or other equipment. Otherwise, it may cause a malfunction.
40 mm or more
Servo amplifier
10 mm
or more
40 mm
or more
(Note 1)
Cabinet
Wiring allowance
80 mm or more
2 - 2
Top
Bottom

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents