Generating A Site Survey Order - 3Com WX1200 Reference Manual

Wireless lan switch
Hide thumbs Also See for WX1200:
Table of Contents

Advertisement

400
C
15: G
HAPTER
ENERATING
Generating a Site
Survey Order
R
EPORTS
9 To prevent 3WXM from replacing an existing report of the same type
with this new report, click next to Overwrite Existing Files to deselect
this option.
10 Click Generate.
11 When the report is generated, click the report link to view it.
The report lists the BSSIDs of the rogues detected by each WX switch. The
report also shows graphs of the distribution of rogues on the WX
switches, and of trend data.
The site survey order contains the locations and MAC addresses of the
line-of-site (LOS) points for use when conducting a site survey, and also
provides a GIF image of the floor.
For the site survey order to be meaningful, you must specify the
line-of-site (LOS) points first. (See "Importing RF Obstacle Data from a Site
Survey" on page 100.)
To generate a site survey order
1 Select the Reports tool bar option.
2 In the Report Category list, select RF Plan Reports.
3 In the Reports list, select Site Survey Order.
4 Select the scope for the work order. You can select the network plan, a
site, a building, or an individual floor.
5 Select the language:
English
German
6 To change the output directory for the report, click on the button next to
output directory, navigate to the new directory, and click Select.
7 Click Generate.
8 When the report is generated, click View. A browser window containing
the report opens.
9 Optionally, select the floor.
10 Click View Site Survey Order. The site survey order appears. LOS point
information for the selected floor is displayed.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wx2200Wx4400Wxr100

Table of Contents