3Com WX1200 Reference Manual page 148

Wireless lan switch
Hide thumbs Also See for WX1200:
Table of Contents

Advertisement

148
C
5: P
HAPTER
LANNING THE
3C
M
S
OM
OBILITY
YSTEM
9 Click Finish to accept the channel assignments.
The new channel assignments are reflected in the Coverage Areas panel.
10 Do one of the following:
To verify the RF network, see "Verifying the Wireless Network" on
page 152.
Click Finish to save the changes and close the wizard.
For MAPs that are in the network plan, but are not yet deployed and
managed by 3WXM, the channel number is changed to match the results
of channel assignment. However, the channel is not changed for MAPs
that are running in the live network and are being managed by 3WXM.
For these MAPs, 3WXM displays the channels that are in use on the live
MAPs.
To make the MAPs in the live network use the channels assigned by RF
Planning, deploy the configuration to the network. After you deploy the
configuration with the new channel settings, the channel information on
the floor plan should match the channels assigned by RF Planning.
The MAPs on a floor plan in RF Planning are color coded to indicate their
monitored status:
Green—Up

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wx2200Wx4400Wxr100

Table of Contents