Preinstallation Check; Chapter 2 Installation Instructions - GE VersaMax Manual

Table of Contents

Advertisement

Installation Instructions
Chapter
2
This section gives basic installation instructions.

Preinstallation Check

Conformance to Standards
Thermal Clearance
DIN Rail and Panel Mounting
Installing Carriers
Expansion System Installation
Installing a Power Supply
System Wiring Guidelines
System Grounding
Installing Wiring for I/O Devices
Installing Modules
Preinstallation Check
Carefully inspect all shipping containers for damage during shipping. If any part of the
system is damaged, notify the delivery service immediately. The damaged shipping
container should be saved as evidence for inspection by the delivery service. As the
consignee, it is your responsibility to register a claim with the delivery service for damage
incurred during shipment. However, GE Fanuc will fully cooperate with you, should such
action be necessary. After unpacking the VersaMax modules and other equipment, record
all serial numbers. Serial numbers are required if you should need to contact Product
Service during the warranty period of the equipment. All shipping containers and all
packing material should be saved should it be necessary to transport or ship any part of the
system.
GFK-1504K
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents