Power-On Procedure - HP StorageWorks Edge Switch 2/12 Service Manual

Hide thumbs Also See for StorageWorks Edge Switch 2/12:
Table of Contents

Advertisement

Repair Information

Power-On Procedure

To power on the switch:
1. One alternating current (AC) power cord is required for the power supply.
2. Plug the power cord into a facility power source and power supply AC
3. During POSTs:
4. After successful POST completion, the green power (PWR) LED remains
5. If a POST error or other malfunction occurs, go to
112
Ensure a power cord is available to connect the switch to facility power.
WARNING:
2/12 power supply. To prevent electric shock when connecting
the switch to primary facility power, use only the supplied power
cord and ensure the facility power receptacle is the correct type,
supplies the required voltage, and is properly grounded.
connector at the rear of the switch. When the power cord is connected, the
switch powers on and performs power-on self-tests (POSTs).
— The green power (PWR) LED on the switch front panel illuminates.
— The amber system error (ERR) LED on the switch front
panel blinks momentarily while the switch is tested.
— The green LED associated with the Ethernet port blinks momentarily
while the port is tested.
— The blue/green and amber LEDs associated with the ports blink
momentarily while the ports are tested.
illuminated and all amber LEDs extinguish.
on page 32 to isolate the problem.
An HP power cord is provided for the Edge Switch
Edge Switch 2/12 Service Manual
"MAP 0000: Start
MAP"

Advertisement

Table of Contents
loading

Table of Contents