Preparations for Commissioning

Before you start commissioning, you will need to carry out the preparations described in this
chapter:
● Requirements for commissioning
● PROFIBUS/PROFINET components
● Rules for wiring with DRIVE-CLiQ
1.1

Requirements for commissioning

The following are the basic requirements for commissioning a SINAMICS S drive system:
● STARTER commissioning tool
● PROFIBUS or PROFINET interface
● Wired drive line-up (see Equipment Manual)
The following diagram shows a basic sample configuration with booksize and chassis
components.
Commissioning
Commissioning Manual, (IH1), 07/2007 Edition, 6SL3097-2AF00-0BP7
1
17