Siemens SINAMICS S120 Commissioning Manual page 19

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Table 1-1
The ambient conditions must be permissible. See Equipment Manuals.
The components must be firmly attached to the fixing points provided.
The cooling air can flow unobstructed.
The ventilation clearances for the components must be observed.
The CompactFlash Card must be inserted in the Control Unit.
All necessary components of the configured drive line-up are installed and available.
The DRIVE-CLiQ topology rules must be observed.
The line-side and motor-side power cables must be dimensioned and routed in
accordance with the ambient and routing conditions. The maximum permissible cable
lengths between the converter and the motor must be observed depending on the type
of cables used.
The cables must be properly connected with the correct torque to the component
terminals. The cables for the motor and low-voltage switchgear must also be
connected with the required torques.
Has all wiring work been successfully completed?
Are all connectors correctly plugged in and screwed in place?
Have all the screws been tightened to the specified torque?
Have all the covers for the DC link been closed and latched into place?
Are the shield connections installed correctly?
Checklist for commissioning chassis power units
The following checklist must be carefully observed. Read the safety information in the
Equipment Manuals before starting work.
Table 1-2
The ambient conditions must be permissible. See Equipment Manuals.
The components must be properly installed in the cabinet units.
The air flow for the modules, which undergo forced cooling, must be ensured. The
ventilation clearances must be ensured. The air flow specified in the technical
specifications must be ensured. An air short-circuit must not be allowed to form between
the chassis air inlet and outlet on account of the installation.
The ventilation clearances for the components must be observed.
The CompactFlash Card must be inserted in the Control Unit.
All necessary components of the configured drive line-up are installed and available.
The DRIVE-CLiQ topology rules must be observed.
Commissioning
Commissioning Manual, (IH1), 07/2007 Edition, 6SL3097-2AF00-0BP7
Checklist for commissioning (booksize)
Checklist for commissioning (chassis)
1.1 Requirements for commissioning
Check
Activity
Preparations for Commissioning
O. K.
O. K.
19