Commissioning
2.5 Initial commissioning using servo (booksize) as an example
What to do?
4.
Summary
5.
Configure the drive
unit.
2.4.3
Searching for nodes that can be accessed
To search for a drive unit online, the drive unit and the PG/PC must be connected via
PROFIBUS or PROFINET. The interface must be set correctly in STARTER.
2.5
Initial commissioning using servo (booksize) as an example
The example provided in this section explains all the configuration and parameter settings as
well as the tests that are required for initial commissioning. Commissioning is carried out
using the STARTER commissioning tool.
Requirements for commissioning
1. The commissioning requirements have been met.
2. The checklist for commissioning has been completed and all items are O.K.
3. STARTER is installed and ready to run.
4. The electronics power supply (24 V DC) is switched on.
58
You have now created the project.
-> Click "Complete".
Once you have created the project, you have to configure the drive unit. The following
sections provide some examples.
--> see the "Readme" file on the STARTER installation CD.
How to do it?
Commissioning Manual, (IH1), 07/2007 Edition, 6SL3097-2AF00-0BP7
Commissioning