Network Specification Checklist

Logistics Checklist Considerations
Does the building have adequate
receiving space?
Is the unpacking area air-conditioned
to avoid thermal shock for various
hardware components?
Will sufficient moving personnel be
available to install the hardware?
Is union labor required for any part of
the delivery or installation?
Are you prepared for uncrating and
trash removal?
Is uncrating of cabinet and cabinet
trash removal required?
Are there any restrictions on delivery
truck length, width or height?
Does the customer allow cardboard
boxes and other packing material in
the computer room? If no, then do
ground level deliveries require a
truck with a side rail lift?
Is there a time constraint on dock
access? If yes, then provide time
constraints.
Is tail lift required on delivery carrier
to unload the equipment at the
delivery dock?
Will any of the following be required
to place equipment in computer
room?
Stair walkers
Lifters
Ramps
Steel plates
Floor covers
Does the delivery carrier require any
special equipment, such as non-floor
damaging rollers, transport dollies,
pallet jacks or fork lifts?
B.9 Network Specification Checklist
Complete the following checklist to ensure that the network specification
requirements are met. For information about IP addresses, see
Requirements and
B-8 Oracle Exalogic Elastic Cloud Machine Owner's Guide
Yes
No
N/A
Comment
Configuration.
Understand Network

Advertisement

Table of Contents
loading