Access Route Considerations
If an elevator is to be used, then have
you confirmed the following:
•
The elevator car is wide enough
for the device to be carried into it?
•
The elevator car is high enough for
the device to be carried into it?
•
The load limit of the elevator is
greater than the device weight?
•
Are elevators available to handle
up to 1049.09 kg (2308 lbs) fully-
loaded rack capacity?
•
The elevator door meets the
minimum height requirement of
86 inches for packaged rack
delivery?
Does the path from the receiving
location to the designated data center
area support the weight of the
unpacked equipment?
Is the path onto the raised floor rated
for dynamic loading of the server?
Refer to
Flooring Requirements
requirements.
B.5 Facility Power Checklist
Complete the following checklist to ensure that the facility power requirements are
met. For information about power requirements, see
Facility Power Considerations
Do you know the required operating
voltage and electric current level of the
device and peripherals?
Will you be using single-phase (low-
voltage or high-voltage) or 3-phase
(low-voltage or high-voltage) power?
Are enough power outlets provided
within 2 meters for each rack?
Do the power outlets have appropriate
socket receptacles for the PDU option
ordered? Options are low voltage or
high voltage, single-phase or 3-phase.
Will optional ground cables be attached
to the rack?
Are the circuit breakers for the
equipment suitable in terms of voltage
and current-carrying capacities?
Yes
No
N/A
for
Yes
No
N/A
Comment
Electrical Power
Comment
Facility Power Checklist
Requirements.
Site Checklists B-5