Power Checklist
Facility Power Considerations
Does the power frequency meet the
equipment specifications?
Are power outlets available for the new
equipment at the designated location?
Will system power be delivered from
two separate grids?
Is there a UPS to power the equipment?
Do you have the minimum required
power sources to support the power
load for the new hardware? Use
kilowatt (kW) /kilovolt (kVA) to
express power load.
B.6 Power Checklist
Complete the following checklist to ensure that the power requirements are met for
Sun Oracle Database Machine. For information about power requirements, see
Electrical Power
Power Checklist Considerations
Do you have the minimum required
power sources?
Are power outlets available for the new
equipment at the designated location?
Does the power frequency meet the
equipment specifications?
Is there a UPS to power the equipment?
Is the capacity of the UPS sufficient for
the Exalogic machine?
Does the power source support the
power load for the new hardware? Use
kilowatt (kW)/kilovolt (kVA) to
express power load.
B.7 Safety Checklist
Complete the following checklist to ensure that the safety requirements are met. For
information about safety, see
Temperature and Humidity
Safety Checklist Considerations
Is there an emergency power shut off?
B-6 Oracle Exalogic Elastic Cloud Machine Owner's Guide
Yes
No
N/A
Requirements.
Yes
No
N/A
Operational Procedures for Exalogic
Requirements.
Yes
No
N/A
Comment
Comment
Comment
Machines, and
Need help?
Do you have a question about the Exalogic Elastic Cloud and is the answer not in the manual?
Questions and answers