Oracle Exalogic Elastic Cloud Owner's Manual page 264

Table of Contents

Advertisement

Access Route Checklist
Access Route Considerations
Has the access route been checked for
clearances of the packaged equipment?
Do all the doors and entry ways
conform to the width and height
requirements for transportation,
including the width of the unpacked
unit?
Do all the doors meet the height
requirement of minimum 86 inches for
packaged delivery?
Does the access route provide sufficient
space for transport of the packed
devices?
Are there any ramps or thresholds that
are of concern? If yes, then provide
details.
Are there any stairs or ramps in the
moving patch for the new hardware?
Have you confirmed that all route
incline angles are within the permitted
range?
Have you confirmed that the access
route is free of any obstacles that would
expose the device to shock?
Are all the surfaces acceptable for
rolling the new unpacked and packed
equipment?
If a pallet jack is to be use, then have
you confirmed the following:
The pallet jack supports the device
weight?
The pallet jack tines are compatible
with the shipping pallet?
If there are stairs, then is a loading
elevator accessible for the equipment?
B-4 Oracle Exalogic Elastic Cloud Machine Owner's Guide
Yes
No
N/A
Comment

Advertisement

Table of Contents
loading

Table of Contents