Reinstalling The Fpcs After Installing The Mx240 Router Without A Lift; Figure 70: Reinstalling A Dpc - Juniper mx240 Hardware Manual

Universal edge router
Hide thumbs Also See for mx240:
Table of Contents

Advertisement

Reinstalling the FPCs After Installing the MX240 Router without a Lift

Copyright © 2016, Juniper Networks, Inc.
Lift the DPC into place and carefully align the sides of the DPC with the guides inside
6.
the card cage.
Slide the DPC all the way into the card cage until you feel resistance.
7.
Grasp both ejector handles and rotate them clockwise simultaneously until the DPC
8.
is fully seated.

Figure 70: Reinstalling a DPC

To reinstall a DPC (see
Figure 71 on page
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Place the FPC on an antistatic mat or remove it from its electrostatic bag.
2.
Identify the two DPC slots on the router where the FPC will be installed.
3.
Verify that each fiber-optic transceiver on the PIC is covered by a rubber safety cap.
4.
If it does not, cover the transceiver with a safety cap.
Orient the FPC so that the faceplate faces you.
5.
Lift the FPC into place and carefully align the sides of the FPC with the guides inside
6.
the card cage.
Slide the FPC all the way into the card cage until you feel resistance.
7.
Grasp both ejector handles and rotate them clockwise simultaneously until the FPC
8.
is fully seated.
Chapter 16: Installing the MX240 Router
192):
191

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx240 3d

Table of Contents