MX240 3D Universal Edge Router Hardware Guide
Related
Documentation
Installing the MX240 Chassis in the Rack Manually
186
Figure 65: Removing an FPC
Tools and Parts Required to Replace MX240 Hardware Components on page 220
Installing the MX240 Chassis in the Rack Manually on page 186
Reinstalling Components in the MX240 Router After Installing it without a Lift on
page 188
Preventing Electrostatic Discharge Damage to an MX240 Router on page 416
To install the router in the rack (see
CAUTION:
If you are installing more than one router in a rack, install the
lowest one first. Installing a router in an upper position in a rack or cabinet
requires a lift.
CAUTION:
Before front mounting the router in a rack, have a qualified
technician verify that the rack is strong enough to support the router's weight
and is adequately supported at the installation site.
CAUTION:
Lifting the chassis and mounting it in a rack requires two people.
The empty chassis weighs approximately 52.0 lb (23.6 kg).
Ensure that the rack is in its permanent location and is secured to the building. Ensure
1.
that the installation site allows adequate clearance for both airflow and maintenance.
Position the router in front of the rack or cabinet, centering it in front of the mounting
2.
shelf. Use a pallet jack if one is available.
Figure 66 on page
187):
Copyright © 2016, Juniper Networks, Inc.