– First insert input shaft -1-, output shaft for 5th/6th gears -2-
together with selector rod -3-, shift fork -4- and reverse shaft
-5-.
To transmission build date 5/24/09
•
Bearing for reverse gear shift fork:
– Mount reverse gear shift fork -1- on axle -2- behind 5th/6th
gear selector rod -3-.
From Transmission Build Date 5/25/09
•
Bearing for reverse gear shift fork:
– Mount reverse gear shift fork -1- on the selector rod with 5th/
6th gear shift fork -2-.
Continuation for all Transmissions
Manual Transmission - Edition 10.2009
Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by AUDI AG. AUDI AG does not guarantee or accept any liability
with respect to the correctness of information in this document. Copyright by AUDI AG.
Audi TT 2007 ➤
5. Disassembly and Assembly
147