Steps After Installation Of The Engine - Mazda B-Series 1997 Workshop Manual

Table of Contents

Advertisement

INSTALLATION
27. Connect the high-tension lead wires to the ignition coils.
28.
Connect the upper and lower heater hoses to the engine.
29.
Connect the power brake unit vacuum hose.
30. Connect the engine wiring harness 'to the ignition coils,
solenoid valves, water temperature sender unit, and radio
interference capacitor.
31. Install the generator and drive belt. (Refer to Section G.)
32. Connect the Engine Coolant Temperature (ECT) sensor.
33. Install the radiator. (Refer to Section E l .)
34. Connect the radiator overflow hose.
35. Install the fan guard, if equipped, or the fan shroud.
36. Connect the upper and lower radiator hoses.
37. Connect the air cleaner outlet tube to the throttle body.
38. Connect the Mass Air Flow (MAF) and Intake Air Tem-
perature (IAC) sensors.
39. Install the hood and align.
40.
Connect fuel pump inertia switch connector.
Steps After Installation
1.
Fill the engine with specified amount and type of engine oil. (Refer to Section D l
.)
2. Fill the radiator with the specified amount and type of engine coolant. (Refer to Section
E l .)
3. If the transmission was drained, fill it with the specified amount and type of transmission oil.
4. Connect the negative battery cable.
5. Start the engine and check the following.
(1) Engine oil, transmission oil, and engine coolant leakage.
(2) Drive belt tension.
(3) Ignition timing and idle speed. (Refer to page B1-6.)
(4)
Operation of emission contrcll system.
(5) Kickdown cable (AT).
6. Perform a road test.
7.
Recheck the engine oil and coolant levels.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents