Mazda B-Series 1997 Workshop Manual page 596

Table of Contents

Advertisement

G
CHARGING SYSTEM
Installation Note
Voltage regulator I brush holder assembly
1. Install the brush holder assembly on the voltage regulator.
Tightening torque:
2 . 8 4 . 0 N.m ( 2 9 4 0 kgf-cm, 24--35 in-lbf)
2. Replace the cap of the Terminal A screw.
3. Depress the brushes into the brush holder assembly and
hold the brushes in position by inserting a standard size
paperclip. Insert the paperclip through both the location
hole in the voltage regulator and through the hole in the
brushes.
4. Install the voltage regulator
/
brush holder assembly on
the generator.
Tightening torque:
2.3-3.4
N-m (23-34
kgf.cm, 20-30
in.1 bf)
4BUOGX-022

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents