Mazda B-Series 1997 Workshop Manual page 694

Table of Contents

Advertisement

OIL SEAL
11. lnstall the front yoke, rubber seal, steel washer and
locknut.
Tightening torque:
250-275
N.m (25-28
kgf-m, 184--204 ft-lbf)
12. Install the front propeller shaft to the transfer case.
(Refer to Section L.)
Tightening torque:
16-22
N.m (1.6-2.2
kgf-m, 12-1 6 ft.lbf)
1
)
13. lnstall the transfer case drain plug.
Tightening torque:
19-30
N-m (1.9-3.0
kgf.m, 14--22 ftdbf)
14. Add the specified amount and type of fluid. (Refer to
page J2-6.)
15. lnstall the filler plug.
Tightening torque:
MJI 148-A
5BUOJ2-005
19-30
N.m (1 3-3.0
kgfem, 14-22
ft-lbf)
16.lnstall the damper, if equipped.
Tightening torque:
3 4 4 8 N-m ( 3 . 4 4 . 8 kgf.m, 25-35
ft-lbf)
Note
Apply threadlock to the bolts.
17. lnstall the skid plate, if equipped.
Tightening torque:
20-27
N-m (2.1-2.7
kgfem, 15-20
ft.lbf)

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents