Mazda B-Series 1997 Workshop Manual page 789

Table of Contents

Advertisement

--
STEP
INSPECTION
Drain flu~d and remove fluid pan.
Check Internal harness connector
IS
fully engaged on EPC
solenoid.
Check Internal harness connector terminals are fully seated In
connector.
Inspect connectors for damage.
Is everything
OK?
Disconnect internal harness from EPC solenoid.
Connect posrtive lead from ohmmeter to EPC tester jack and
negative lead to blue wrre at EPC connector. Record resistance.
Next, connect positive lead from ohmmeter to VPWR tester
jack and negative lead at green wire at EPC connector. Record
resistance.
All resistance readings should be less than 0.5 ohms.
Is resistance less than 0.5 ohms?
10
Check for continuity between BAT
-
(engine ground) and
appropriate wire (Green+lBlue - ) with ohmmeter.
Connection should show inffnite resistance (no continuity)
1
Is there continuity?
Yes
Go to step
9
1
No
Servlce as requrred
I
I
Yes
Go to step 10
I
No
,
Replace Internal harness
,
I
Yes
Replace internal harness. Go to step 11
No
Go to step 11
f
1
Check solenold res~stance by
connecting
ohmmeter at EPC
Yes
Go to step 12 Replace shift solenold
term~nals Record resistance
,
Is res~stance between 3 1 to 5
7
ohms?
No
Replace EPC soleno~d
12
Check for cont~nu~ty between a good ground and each EPC
Yes
Replace EPC solenold
term~nal
Connection should show lnf~n~te
res~stance (no cont~nu~ty)
No
Refer to Qu~ck D~agnos~s Chart In thls sectlon for
Is there contlnulty7
further dragnosls
1
13
Perform After Repair Procedure to ensure customer's concern has been resolved.
7BUOKX-008
MK7E39-61

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents