Mazda B-Series 1997 Workshop Manual page 128

Table of Contents

Advertisement

INSTALLATION
B1
17. Install the
AIC
compressor
and
power steering pump
bracket.
Tightening torque:
Bolt A: 41-54
N.m (4.1-5.5
kgf-m, 30--40 ft4bf)
Bolt B: 21-28
N-m (2.1-2.8
kgf.m, 16-21
ft-lbf)
18. Install the air conditioning compressor to the mounting
bracket, if equipped.
Tightening torque:
22-28
N.rn (2.3-2.9
kgfem, 16--21 ftelbf)
A: 41-54
t4.1-5.5,
19. Connect the air conditioning hoses to the suction
accumulator and to the condenser, ilf equipped. (Refer
to Section G in the 1997 B-Series BETM.)
20. Connect the evaporative emission purge hose to the
engine.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents