04/SHOCK ABSORBER, SWINGARM
Rear shock absorber - filling the damper with nitrogen
8.41
–
When the pressure gauge reaches the required value, turn control lever Damper
to Pressure.
Guideline
0 bar
Oil is pumped into the damper.
The pressure gauge increases to the required value.
3 bar
200268-10
–
When the pressure gauge reaches the required value, turn control lever Damper
to Vacuum.
Guideline
3 bar
The pressure gauge drops to the required value.
0 bar
–
When the pressure gauge reaches the required value, activate the On/Off switch.
Guideline
200269-10
0 bar
The vacuum pump is switched off.
–
Slide O-ring
minus specified value).
Guideline
10 mm
Depth micrometer (T107S) (
–
Push the floating piston into the reservoir to the distance described above using the
special tool.
201092-10
Info
When the piston rod is fully extended, the floating piston must be at pre-
cisely this position; otherwise, damage will occur when the shock absorber
compresses and rebounds.
–
Remove the special tool.
–
Remove adapter
Info
Hold the damper so that the filling port is at the highest location.
–
Remove the adapter.
–
Mount and tighten screw
Guideline
Screw, filling port
201093-10
–
Screw in screw
Info
The piston rod is fully extended.
201095-10
to the end of the special tool by the specified value (distance
p. 237)
from connector
of the vacuum pump.
.
by approx. 2 turns but do not tighten.
M10x1
14 Nm
(10.3 lbf ft)
56