332 Managing WSS System Images and Configurations
Table 4
lists the columns in the operation log.
Column
Task
Status
User
Start Time
End Time
Details
Canceling a Scheduled Operation
1
Select the Devices tool bar option.
2
At the bottom of the Task List panel, select Device Operations.
3
In the Managed Devices list, select the WSSs with scheduled tasks you want to cancel.
To select more than one WSS, click Shift while clicking to select contiguous items, or click Ctrl while
clicking to select noncontiguous items.
4
In the Task List panel, select Cancel Scheduled Operation.
The Deploy Status column in the Managed Devices table indicates that the operation has been canceled.
Importing and Exporting Switch Configuration Files
You can import or export switch configuration files in Extensible Markup Language (XML) format.
•
The import option enables you to create a WSS in the network plan by importing configuration files in Extensible
Markup Language (XML) format. You also can update the configuration of a switch that is already in the plan.
•
The export option enables you to save a switch's configuration to an XML file. After exporting a WSS
configuration to an XML file, you can import it to another instance of WLAN Management Software or use it as a
backup copy.
If you import a configuration containing information that an older version of WLAN Management Software or WSS
Software does not support, the information is ignored when the configuration is imported.
If you import a switch configuration, you must enable WLAN Management Software management of the switch before
you can deploy the switch to the network. (To enable WLAN Management Software management of a switch, see
in
"Modifying Basic Switch Parameters" on page
NN47250-102 (320666-G Version 02.01)
Table 4: Devices Operation Log
Description
The operation that was requested. The operations are tasks
available on the Devices tab.
Status of the operation:
•
Scheduled
•
Completed
•
Cancelled
•
Failed
WLAN Management Software user name
Date and time when the task was started or is scheduled to start
Date and time when the task ended
Description of the success or failure of the task
168.)
step 6