154 Planning the Nortel WLAN 2300 System
Generating RF Network Design Information
After WMS has calculated the number of APs required to provide wireless coverage, you can generate a work order
report. The work order report provides all of the necessary information for the physical installation of the Nortel WLAN
2300 System. A work order shows where the APs should be installed, WSS initial setup configuration information, and
projected RSSI information that is useful when verifying the installation.
After deployment, you can generate a work order with the optional RSSI projection tables and AP MAC addresses, and
use it for post-deployment verification.
To generate a work order report
1
Display the floor plan in the Content panel.
2
In the Task List panel, click RF Planning.
3
Under RF Planning, click Work Order Report. The Work Order Generation dialog is displayed.
4
Specify whether to include the following information in the work order:
•
RF Coverage
•
RSSI Projections
•
Show Disabled APs (only available if RSSI Projections is selected)
•
Show RF Coverage On Entire Floor (only available if RSSI Projections is selected)
NN47250-102 (320666-G Version 02.01)