Test Keys And Battery - GE Datex-Ohmeda Aisys Carestation Reference Manual

Anesthesia machine
Table of Contents

Advertisement

8.3.2 Test Keys and
Display Diagnostics
Test LEDs
Test Speaker
Test Backlight 1
Test Backlight 2
Test Soft Keys

Test Keys and Battery

Test LCD Pixels
-> Previous Menu
M1046983 04/08
Note
: System Software version 3.X only includes the Test Keys function.
System Software version 4.X includes the combined Test Keys and Batery
Battery
function.
Selecting Test Keys and Battery brings up an expanded test keys screen
which includes the battery test.
Press each softkey to display a box.
Press again to clear it.
To start the battery test, shut off the AC mains.
Then wait for the end of the 2-minute countdown.
(You can test the keys while you wait.)
After turning off the AC main inlet switch, the test begins automatically in a
few seconds.
Press each softkey to display a box.
Press again to clear it.
Countdown = XXX sec
Battery 1 (right) = XX.XX Vdc
Battery 2 (left) = XX.XX Vdc
Battery Current = -X.XX A
----------------------------------------------------------------------------
Battery test PASSED/FAILED
Restore AC mains power.
Note
If the Aisys system is operating under battery power, the test begins as soon
as you make the Test Keys and Battery selection, bypassing the instructions.
8 Software Download and Special Functions
Test Soft Keys and Battery
Test Soft Keys and Battery
8-7

Advertisement

Table of Contents
loading

Table of Contents