Flowchart - Panasonic S-LINK V User Manual

Flexible wire-saving system
Hide thumbs Also See for S-LINK V:
Table of Contents

Advertisement

Flowchart

Check before starting
Disconnect the transmission cable
from the controller.
Check whether the cable is shorted.
(Measure the cable resistance value.)
The measurement
(resistance) value is above
the specified value.
Yes
Reconnect the cable to the controller.
Check the wiring condition
of the controller.
OK
Check the wiring
c o n d i t i o n o f t h e
PLC I/O connector.
OK
1
62
Between D and G
Between +24V and 0V
Between +24V and D
No
Localize the disconnected or shorted
point, and then repair the point.
Refer to page
65
NG
Disconnect the cable, and then
reconnect it.
Refer to page
51.
NG
Disconnect the cable, and then
reconnect it.
Refer to page
53.

Advertisement

Table of Contents
loading

Table of Contents