Flowchart - Panasonic S-LINK V User Manual

Flexible wire-saving system
Hide thumbs Also See for S-LINK V:
Table of Contents

Advertisement

Flowchart

To wire each unit, follow the procedure shown in the following flowchart:
DANGER
Before disconnecting or reconnecting a cable or connector, be sure to turn off the power.
Designing of S-LINK V system
Designing
All conditions are
satisfactory (voltage drop,
address setting, etc.)
Learning of basic procedure
Installation of each unit of
S-LINK V system
Cutting of cable depending on
specified cable length
Recheck
Connection of each unit
Setting of PLC I/O connector numbers
(in case of using SL-VCU1)
Setting of each unit address
Temporary starting of system
Controller setting
Error
Occurrence of error
(Error indication)
System starting
36
No
Yes
Refer to page 37 and following pages.
Refer to page 51 and following pages.
Refer to page 33
(For a detailed description, refer to page 73.)
Refer to page 33
(For a detailed description, refer to page 74.)
Refer to page 66.
Normal
Redesigning

Advertisement

Table of Contents
loading

Table of Contents