Panasonic S-LINK V User Manual page 73

Flexible wire-saving system
Hide thumbs Also See for S-LINK V:
Table of Contents

Advertisement

● Connector number setting switches
Be sure to set the PLC I/O connector numbers.
Each PLC I/O connector number will be determined from the sum total of the values set by the connector num-
ber setting switches.
The connector number setting range is 0 to 15.
The relation between the PLC I/O connector numbers and the I/O unit addresses are shown in the following table.
One control cable can control up to 8 PLC I/O connectors. To control 9 or more PLC I/O con-
NOTE
nectors, use 2 control cables so that the number of connectors for each cable can be 8 or less.
<Example: Setting of PLC I/O connector numbers>
Connector number setting switches
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
1 2 4 8
ON
PLC I/O connector number
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Specifications
S-LINK V I/O unit address
0 to 31
32 to 63
64 to 95
96 to 127
128 to 159
160 to 191
192 to 223
224 to 255
256 to 287
288 to 319
320 to 351
352 to 383
384 to 415
416 to 447
448 to 479
480 to 511
73

Advertisement

Table of Contents
loading

Table of Contents