Basic Procedures; Connector Hook-Up Work; Cutting Of Exclusive 4-Core Flat Cable - Panasonic S-LINK V User Manual

Flexible wire-saving system
Hide thumbs Also See for S-LINK V:
Table of Contents

Advertisement

Connector hook-up work

This section describes the knowledge and setup method to be learned before starting connector hook-up work.
CAUTION
● If a connector is not hooked-up correctly, the S-LINK V system will not work.
● If a connector is once hooked-up, do not use the connector again.
This is because the performance of a used connector may be deteriorated.
● Before starting hook-up work, be sure to turn off the power.
● When you disconnect or reconnect a connector, be sure to grab the connector main body.
If you pull the cable to disconnect or reconnect a connector, the cable may be disconnected.
● Do not hook-up any connector in a cold weather, such as outdoors in winter.

Cutting of exclusive 4-core flat cable

Cut the exclusive 4-core flat cable so that the end face of the cable can be orthogonal.
CAUTION
● Cut the exclusive 4-core flat cable so that the end face of the cable can be orthogonal.
If the end face is not orthogonal, the connector may not be hooked-up properly.
● Do not peel the sheath of the exclusive 4-core flat cable.
● After cutting the exclusive 4-core flat cable, check that the cores are not in contact with each other.
Orthogonal
Good
Not good Not good Not good

Basic Procedures

String
Peeling of sheath
37

Advertisement

Table of Contents
loading

Table of Contents