Designing / Installation Procedures - Panasonic S-LINK V User Manual

Flexible wire-saving system
Hide thumbs Also See for S-LINK V:
Table of Contents

Advertisement

Designing / Installation Procedures

Chapter 1 Designing System
● Determine the system design.
● Determine the necessary number of I/O points for
the I/O device.
● Determine the cable length necessary for transmis-
sion.
● Select the transmission speed.
● Set the address.
● Calculate the power supply capacity of the system.
● Determine the connection method for the input de-
vice of DC 2-wire output type.
● Determine the transmission delay time.
● Set the output holding function.
Chapter 2 Wiring
● This chapter describes the wiring methods to be used for actual installation.
● Caution regarding cutting of exclusive 4-core flat
cable
● Connector hook-up method
● Cable extension method
● Connection to I/O device
● Connection of local power supply unit
● Connection to terminal block
Chapter 3 Starting System
● Check the system before starting.
● Check the cable for short-circuit.
● Check the system before starting.
● Caution regarding power-on
● Description of CONFIG mode
● Description of CHECK mode
10
Local power supply unit
A C
F .
G .
Insulated
D
(White)
G
(Black)
+24V (Brown) 0V (Blue)
How long?
Analogue tester
Transmission cable

Advertisement

Table of Contents
loading

Table of Contents