Juniper SRX5400 Hardware Manual page 316

Services gateway
Hide thumbs Also See for SRX5400:
Table of Contents

Advertisement

3. Install the replacement Routing Engine:
a. Power off node 0:
root@node0> request system power-off
b. Wait until a message appears on the console confirming that the services have stopped, and then
physically turn off the power.
c. Label and disconnect all the cables connected to node 0.
d. Replace the Routing Engine.
e. To prevent a split-brain scenario (where the control link is connected while both the nodes are in
the primary state), reconnect only the console cable and the cable to the fxp0 interface. Leave the
rest of the cables disconnected.
f. Ensure that the status of the control link and fabric link on node 1 is down:
root@node1> show chassis cluster interfaces
{primary:node1}
root@node1> show chassis cluster interfaces
Control link status: Down
Control interfaces:
Index
Interface
0
em0
1
em1
Fabric link status: Down
Control interfaces:
Name
Child-Interface
fab0
xe-11/0/3
fab0
g. Power on node 0.
4. Load the configuration file, firmware, and scripts file on the new Routing Engine:
a. Insert the USB flash drive into the USB port on node 0, and access the UNIX-level shell on node 0:
root@node0> start shell user root
b. Copy the configuration file, firmware, and scripts file from the USB:
root@node0% cp /var/tmp/usb/config[date] /var/tmp/config[date]
root@node0% cp /var/tmp/usb/junos version /var/tmp/junos version
Monitored-Status
Down
Down
Status
(Physical/Monitored)
Down / Down
Internal-SA
Security
Disabled
Disabled
Disabled
Disabled
Security
Disable
319

Advertisement

Table of Contents
loading

Table of Contents