Juniper SRX5400 Hardware Manual page 298

Services gateway
Hide thumbs Also See for SRX5400:
Table of Contents

Advertisement

NOTE:
Your services gateway cannot have a mix of SRX5K-SPC-2-10-40 SPCs and
SRX5K-SPC3 SPCs, but starting with Junos OS release 18.2R2 and then 18.4R1 but not
18.3R1 you can have a mix of SRX5K-SPC-4-15-320 SPCs and SRX5K-SPC3 SPCs.
If you are adding the second-generation SRX5K-SPC-4-15-320 SPCs or the next-generation SRX5K-SPC3
SPCs to a services gateway, the services gateway must already be equipped with high-capacity power
supplies and fan trays, and the high-capacity air filters. See Upgrading an SRX5600 Services Gateway from
Standard-Capacity to High-Capacity Power Supplies or Upgrading an SRX5600 Services Gateway from
Standard-Capacity to High-Capacity Power Supplies for more information.
If your installation does not meet these criteria, use the procedure in
Gateway SPC" on page
297, or Installing an SRX5600 Services Gateway SPC, or Installing an SRX5800 Services
Gateway SPC to install SPCs in your services gateway.
NOTE:
During this installation procedure, you must shut down both devices, one at a time.
During the period when one device is shut down, the remaining device operates without a backup.
If that remaining device fails for any reason, you incur network downtime until you restart at
least one of the devices.
To replace SPCs in an Services Gateway cluster without incurring downtime:
1. Use the console port on the Routing Engine to establish a CLI session with one of the devices in the
cluster.
2. Use the show chassis cluster status command to determine which services gateway is currently primary,
and which services gateway is secondary, within the cluster.
3. If the device with which you established the CLI session in Step
cluster, use the console port on the device that is the secondary node to establish a CLI session.
4. Use the show chassis fpc pic-status command to check the status of all the cards on both the nodes.
5. In the CLI session for the secondary services gateway, use the request system power off command to
shut down the services gateway.
6. Wait for the secondary services gateway to shut down completely and than remove the power cables
from the chassis.
"Installing an SRX5400 Services
2
is not the secondary node in the
301

Advertisement

Table of Contents
loading

Table of Contents