Juniper SRX5400 Hardware Manual page 271

Services gateway
Hide thumbs Also See for SRX5400:
Table of Contents

Advertisement

Table 52: List of Interface Cards for Upgrade
Cards to Replace
SRX5K-40GE-SFP
SRX5K-4XGE-XFP
SRX5K-FPC-IOC
SRX5K-RE-13-20
SRX5K-SCB
SRX5K-SCBE
Verify that both services gateways in the cluster are running the same Junos OS versions; release
12.1X47-D15 or later for SRX5K-SCBE with SRX5K-RE-1800X4 and 15.1X49-D10 or later for
SRX5K-SCB3 with SRX5K-RE-1800X4. For more information on cards supported on the services gateways
see Cards Supported on SRX5400, SRX5600, and SRX5800 Services Gateways.
For more information about unified in-service software upgrade (unified ISSU), see
Devices in a Chassis Cluster Using an
To perform an ISHU:
1. Export the configuration information from the secondary node to a USB or an external storage device.
For more information about mounting the USB on the device, refer to KB articles KB12880 and KB12022
from the
Knowledge
Base.
2. Power off the secondary node.
See,
"Powering Off the SRX5400 Services Gateway" on page
Gateway, or Powering Off the SRX5800 Services Gateway.
3. Disconnect all the interface cards from the chassis backplane by pulling them out of the backplane by
6" to 8" (leaving cables in place).
4. Replace the SRX5K-SCBs with SRX5K-SCBEs, or SRX5K-SCBEs with SRX5K-SCB3s and
SRX5K-RE-13-20s with SRX5K-RE-1800X4s based on the chassis specifications.
5. Power on the secondary node.
See:
Replacement Cards for Upgrade
SRX5K-MPC and MICs
SRX5K-MPC and MICs
SRX5K-MPC and MICs
SRX5K-RE-1800X4
SRX5K-SCBE
SRX5K-SCB3
ISSU.
Upgrading Both
207, Powering Off the SRX5600 Services
274

Advertisement

Table of Contents
loading

Table of Contents