NOTE:
If more than one power supply is being installed, turn on all power supplies at the
same time.
11. Verify that the DC source power cabling is correct. Observe the status of the LEDs on the power supply
faceplate. If the power cable is correctly installed and the power supply is functioning normally, the
PWR OK, BRKR ON, and INPUT OK LEDs light green steadily.
Figure 105: Connecting Power Cables to the DC Power Supply
Maintaining the SRX5400 Host Subsystem
IN THIS SECTION
Maintaining the SRX5400 Services Gateway Host Subsystem | 245
Taking the SRX5400 Services Gateway Host Subsystem Offline | 247
Operating and Positioning the SRX5400 Services Gateway SCB Ejectors | 247
Replacing the SRX5400 Services Gateway SCB | 248
Replacing the SRX5400 Services Gateway Routing Engine | 251
244