Install Concrete Floor Mounting; Install Raised Computer Floor Mounting - Avaya S8700 Installing Manual

For multi-connnect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Install Concrete Floor Mounting

Position the media gateway in the exact position it is to occupy when the installation is
1
complete.
2
Insert a pencil or marker through the holes previously occupied by the carriage bolts
(front and rear) in the bottom of the media gateway and mark the floor directly beneath
each hole.
3
Roll the media gateway out of the way and drill four 1/2-in. (1.27 cm) diameter holes
about 1.5 in. (3.8 cm) deep at the locations marked in Step 2.
Insert concrete floor anchors (STARR part number 3425) into the holes.
4
5
Roll the media gateway back into place and align the media gateway holes over the
concrete floor anchors. Adjust the leveling legs until the media gateway is level. See
''Earthquake Mounting — Raised Computer Floor'' on page
NOTE:
If the S8700 Multi-Connect configuration is supplied with cable ductwork, the media
gateways must be level from front to rear and from side to side. They must be square with
respect to each other to within ±1/8-in. (0.3 cm).
Secure the media gateway to the floor with the 4 supplied 3/8-16 x 4.5-in. (11.4 cm) bolts
6
and four 3/8-in. flat washers.
7
Repeat this procedure for each media gateway to be installed.

Install Raised Computer Floor Mounting

1
Position the media gateway in the exact position it is to occupy when the installation is
complete.
2
Insert a pencil or marker through the holes previously occupied by the carriage bolts
(front and rear) in the bottom of the media gateways and mark the raised floor panels
directly beneath each hole.
3
Roll the media gateway out of the way and drill 4 holes 5/8-in. (1.6 cm) in diameter
through the raised floor panels marked in Step 2.
!
CAUTION:
Take care while drilling the holes through the raised floor that the drill bit does not
penetrate any cables below the floor that could cause damage to the cable or injury to the
installer.
4
Insert a long punch through the holes drilled in Step 3 and mark the concrete floor
beneath the raised floor panels.
5
Remove the raised floor panels in which the holes were drilled.
6
Using 1/2-in. (1.3 cm) anchor bits, drill a hole at each of the locations marked in Step 4.
Stop drilling when the mark on the side of the bit reaches the floor level.
May 2002
Installing the S8700 Multi-Connect
Installing an Avaya MCC1 Media Gateway
49.
47

Advertisement

Table of Contents
loading

Table of Contents