Avaya S8700 Installing Manual page 43

For multi-connnect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Perform these tasks before you begin the installation:
''Unpack and Inspect Stratum 3 Clock Cabinet'' on page 107
Perform these tasks to install the media gateways:
''Install Earthquake Protection for Media Gateway'' on page
!
WARNING:
If the approved ground or approved floor ground can only be accessed inside a dedicated
power equipment room, then connections to this ground should be made by a licensed
electrician. See
page 59
''Connect Remote Power Off Cable'' on page 69
''Connect External Alarm Cable'' on page 71
Interconnect cabling between port networks
- Direct connect to rack hardware
- Direct connect to each port network (duplex and high/critical)
- Switch-connect to port networks (duplex and high/critical)
Check the customer's order and the shipping packing lists to confirm all equipment is
1
present.
Check the S8700 Multi-Connect configuration adjuncts for damage and report all
2
damage according to local shipping instructions.
If any equipment is missing, report the information to your Avaya representative.
3
for more information.
or
May 2002
Installing the S8700 Multi-Connect
Installing an Avaya MCC1 Media Gateway
and
''Install Auxiliary Cabinet
46, if required
''Connect DC Power and Ground'' on
43