High-Reliability CSS-Connected PN1 with 1 Switch Node
C
B
A
D
E
cadfcrr KLC 031202
Figure notes
1
Media Gateway 1 (PN1 with 1 Switch Node)
2
Port Network 2 through 15
H600-278 Metallic Cable
3
To other port networks
4

Connect Critical Reliability CSS-Connected PN1

with 1 Switch Node

''Critical-Reliability CSS-Connected PN1 with 1 Switch Node'' on page 76
optic cabling between media gateways. The cable between port slots 1 and 2 on each switch
node is a metallic cable (H600-278).
Connect the 2 groups of 1 to 15 cables between PN1 and each of the other PNs in an alternating
port slot order: 20, 3; 19, 4; 18, 5; and so forth.
C
B
A
D
E
May 2002
Installing the S8700 Multi-Connect
Installing an Avaya MCC1 Media Gateway