Mount 110A- Or 110P-Type Terminal Blocks On The Wall - Avaya S8700 Installing Manual

For multi-connnect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

158
Installing the S8700 Multi-Connect
Patch Cord/Jumper Installation and Administration
Mount 110A- or 110P-type terminal blocks on the
wall
The 110A-type terminal blocks can be stacked in almost any arrangement at any height or
location on the wall. One arrangement is shown in
on page
(27.4 cm). If a vertical patch cord trough is used, the distance between the mounting screw
holes is 5.31 in. (13.3 cm).
With 110P-type terminal blocks, the first block of the trunk/auxiliary field is aligned with the
left side of the media gateway. See
This arrangement allows for growth on the right side of the MDF.
1
2
3
4
5
6
7
8
9
10
159. The distance between the mounting screw holes on the terminal blocks is 10.8 in.
Route the cables from the rear of the media gateway stack to the MDF via the
Slack Manager'' on page
If you are installing 300-pair terminal blocks, draw a level horizontal line on the wall
47.5 in. (1.2 m) above the floor. See
159.
If you are installing 900-pair terminal blocks, draw a level horizontal line on the wall 23
in. (58.4 cm) above the floor. See
160.
To mount the first trunk/auxiliary field terminal block, partially install 2 3/4-in. #12
wood screws, 7-11/16 in. (19.5 cm) apart on the left side of the horizontal line on the
wall.
Slide the bottom terminal block ft onto the mounting screws and mark the upper
mounting screw locations.
Remove the terminal block and partially install the upper mounting screws.
Place the terminal block on the mounting screws and tighten the screws.
If installing a vertical patch cord trough, partially install the first screw for the patch cord
trough, on the line, 7/8-in. (2.2 cm) to the right of the previous screw. Partially install the
second mounting screw 5.31 in. (13.5 cm) to the right of the screw just installed. Repeat
Steps 4, 5, and 6.
If another trunk/auxiliary field terminal block is to be installed, partially install the first
screw for the terminal block, on the line, 7/8-in. (2.2 cm) to the right of the previous
screw. Partially install the second mounting screw 7-11/16 in. (19.5 cm) to the right of
the screw just installed. Repeat Steps 4, 5, and 6.
If a horizontal patch cord trough is to be installed, install it, on the line, between the
trunk/auxiliary field and the distribution field.
To install the first distribution field terminal block, partially install 2 3/4-in., #12 wood
screws, 7-11/16 in. (19.5 cm) apart on the line, to the right of the vertical patch cord
trough. Repeat Steps 4, 5, and 6.
''110A-Type Terminal Blocks (300-Pair)''
''110P-Type Terminal Blocks (900-Pair)'' on page
134. See
''Install Cable Slack Managers'' on page
''110A-Type Terminal Blocks (300-Pair)'' on page
''110P-Type Terminal Blocks (900-Pair)'' on page
May 2002
160.
''Cable
162.

Advertisement

Table of Contents
loading

Table of Contents