Avaya S8700 Installing Manual page 159

For multi-connnect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

11
If installing another distribution field terminal block, partially install the first screw for
the terminal block, on the line, 7/8-in. (2.2 cm) to the right of the previous screw.
Partially install the second mounting screw 7-11/16 in. (19.5 cm) to right of the screw
just installed. Repeat Steps 4, 5, and 6.
If installing a vertical patch cord trough in the distribution field, repeat Step 6.
12
Repeat Steps 11 and 12 until all the terminal blocks and vertical patch cord troughs in the
13
distribution field are installed.
110A-Type Terminal Blocks (300-Pair)
Figure notes
4 ft (1.22 m)
1
2
6.6 ft (2 m)
3
7.68 in. (19.5 cm)
4
7/8-in. (2.22 cm)
5.31 in. (13.5 cm)
5
Patch Cord/Jumper Installation and Administration
47.5 in. (120.6 cm)
6
7
Horizontal Line
8
AC Power Strip
9
Floor Line
May 2002
Installing the S8700 Multi-Connect
r758420b MMR 031496
159

Advertisement

Table of Contents
loading

Table of Contents