128
Installing the S8700 Multi-Connect

Cable Installation

Cable Installation
NOTE:
To route the cables from the rear of the SCC stack or MCC to the MDF, use the
Cable Slack Managers'' on page 162
page
This section has information about
And procedures for:

Equipment Room Cabling Labels

The purple port label shown in
both ends of the 25-pair cables connecting to the trunk/auxiliary field and/or distribution field.
The top blue/yellow building and floor labels are for cables connecting from the equipment
room to a site/satellite location on another floor or in another building. The yellow label is for
auxiliary circuits connecting to the trunk/auxiliary field. The bottom blue/yellow label is for
25-pair cables connecting to site/satellite closets.
''Equipment Room Labels'' on page 130
''Cable/Connector/Building Label Ordering Information'' on page 131
information.
''Self-Stick Label on 25-Pair Cable Connector'' on page 131
label on a 25-pair cable connector. Install the label near the rear of the connector so it is not
obscured by the media gateway connector retainers. It can also be installed on the skin of the
cable near the connector.
134.
''Equipment Room Cabling Labels'' on page 128
''Cable Routing Guidelines'' on page 129
''Control Carrier Outputs Cable Installation'' on page 129
''Connect Expansion Control Carrier Outputs Cable'' on page 153
''Trunk Cables Among Network Interface, Sneak Fuse Panel, and Media Gateway'' on
page 130
''Label Expansion Control Carrier Cable'' on page 152
''Connect Expansion Control Carrier Outputs Cable'' on page 153
''Connect Trunk Pairs Using Concentrator Cables'' on page 153
''Connect Trunk Pairs to Media Gateway Using Jumper Wires To Establish 3-Pair
Modularity'' on page 154
''Install Cables Between Media Gateway and MDF'' on page 156
''Install Connector Cables Between Auxiliary Cabinet and MDF'' on page 157
procedure. Also see
''Equipment Room Cabling Labels'' on page 130
details the label name and range of each label.
May 2002
''Cable Slack Manager'' on
is installed on
provides label ordering
shows the proper way to install a
''Install

Advertisement