Safety Integrated Functions
8.7 Commissioning
8.7.2.4

Information pertaining to series commissioning

Standard commissioning of the safety functions
1. A commissioned project that has been uploaded to STARTER can be transferred to
2. If the source and target devices have different software versions, the reference
Reference checksums
p9729[0...2]
p9399[0...1]
p9799
p9899
Once the project has been downloaded to the target device, an acceptance test must be
carried out. This is also indicated by fault F01650 (fault value: 2004 or 2005).
Before re-entering the danger area and before resuming operation, a simplified function test
must be carried out for the drive affected by the component exchange (see the
"Acceptance test" chapter).
434
another drive unit keeping the existing Safety parameterization.
checksums may have to be adapted. This is indicated by a fault:
WARNING
Error
F01680 (fault value: 0...2)
F30680 (fault value: 0...1)
F01650 (fault value: 1000)
F30650 (fault value: 1000)
Function Manual, 01/2011, 6SL3097-4AB10-0BP3