Ect Sensor Removal And Installation; Ect Sensor Inspection; Thermostat Removal And Installation - Suzuki Intruder VZ1500 Service Manual

Hide thumbs Also See for Intruder VZ1500:
Table of Contents

Advertisement

4) First check the insulation between "A" and "B"
terminals with tester. Then apply 12 V to "C" and "D"
terminals, (+) to "C" and (–) to "D", and check the
continuity between "A" and "B".
If there is no continuity, replace it with a new one.
Special tool
: 09900–25008 (Multi-circuit tester set)
Tester knob indication set
Continuity test (
"A"
"B"
5) Reinstall the removed parts.

ECT Sensor Removal and Installation

Refer to "ECT Sensor Removal and Installation in
Section 1C (Page 1C-4)".

ECT Sensor Inspection

Refer to "ECT Sensor Inspection in Section 1C
(Page 1C-5)".

Thermostat Removal and Installation

Removal
1) Drain a small amount of engine coolant. Refer to
"Cooling System Inspection in Section 0B (Page 0B-
11)".
2) Remove the left air cleaner cover. Refer to "Air
Cleaner Element Removal and Installation in Section
1D (Page 1D-6)".
3) Disconnect the radiator inlet hose (1).
4) Remove the connector cap (2).
)
"C"
"D"
I718H1160006-03
B940H21606011
B940H21606012
B940H21606013
1
2
I940H1160016-01
Engine Cooling System:
5) Remove the thermostat (3).
Installation
Install the thermostat in the reverse order of removal.
Pay attention to the following points:
• Install the thermostat.
NOTE
The jiggle valve "A" of the thermostat faces
upside.
• Tighten the thermostat connector bolts (1).
• Connect the water hose (2) securely.
1
• Pour engine coolant and bleed air from the cooling
circuit. Refer to "Cooling System Inspection in Section
0B (Page 0B-11)".
1F-9
3
I940H1160017-01
"A"
I940H1160018-01
2
I940H1160019-01

Advertisement

Table of Contents
loading

Table of Contents